Equipment costs should not be included in a bid if the contractor owns the equipment free and clear.
Q: A 30⁰ 3m B 2.7 kN 30° 3m E 4.5 kN 30° 3m 1
A:
Q: 2. The average wastewater flow from a community of 20,000 is 125 gpcd. The 5 day, 20 deg C BOD is…
A: Population = 20000To Find:1) Settling tank surface area2) Settling tank diameter3) BOD removal in…
Q: To determine the mean elevation of a station O interpolated in a triangulation system, the following…
A:
Q: Discuss the relationship between bending moment, shear force and deflection, please provide all the…
A: The relationship between bending moment, shear force, and deflection is fundamental to the study of…
Q: A composite shaft consists of a hollow bronze (G=40 GPa) cylinder with a 150-mm outside diameter and…
A: A hollow bronze (G=40 GPa) cylinder with an outer diameter of 150 mm and an inner diameter of 100 mm…
Q: For a highway curve with Da = 5°00', I= 20°30', and Pl station=63+25.53 ft, calculate the requested…
A:
Q: 6-40. The compound beam is fixed supported at C and supported by rockers at A and B. If there are…
A: To find reactions at support A, B and C
Q: Use Meyerhofs effective area method estimate the ultimate load per unit length of the foundation.
A: Eccentrically Loaded ColumnB = 1.8 mDf = 0.9me = 0.12 Be=0.216m
Q: 7-6. Determine the equation of the elastic curve for the beam using the x coordinate. Specify the…
A: EI = ConstantDetermine the equation of the elastic curve, slope at A and maximum deflection of the…
Q: Determine the reactions at supports. Assume “EI” is constant. Draw the moment diagram. Select the…
A: Given:Required:Support reaction and moment diagram
Q: The architects specify that a cover-plated beam no greater than 16.00 in in depth be designed to…
A:
Q: On the given beam, find the following unknowns using the slope-deflection method. Assume that E is…
A:
Q: A beam of (15x15x60) cm is subjected to a three-point bending test (three-point bending- modulus of…
A: The 3-point bending test is used to calculate the beam flexural strength. The test is conducted on…
Q: What is the BENDING MOMENT AT A?
A:
Q: 3. The back and forward tangent’s grade are -3.4% and +4.1%, respectively. It is to be connected…
A: Given the back and forward tangent’s grade of -3.4% and + 4.1% respectively, and an unsymmetrical…
Q: Hello, can you explain more about the theory in simpler terms? Why would they need to use this…
A: Euler-Bernoulli beam theory is a method to analyze a slender beam (a slender beam has a length much…
Q: Water is pumped from the river through a 45-mm-diameter hose having a length of 3 m. The friction…
A: Diameter of the pump hose = 45mm = 0.045mLength = 3mFriction…
Q: P10.9 For the beam and loading shown in Figure P10.9, use the double-integration method to determine…
A:
Q: rence between a two way flat slab and two way flare plate
A: Both Two way flat slab and two way flat plate are structural systems used in building construction…
Q: A one-way both ends continuous slab is to support the moments tabulated. Consider L= 5m. Fc’ = 21MPa…
A: L= 5mFc’ = 21MPafy = 415MPa.Dead load Moments: +42KN.m at midspan ;-67KN.m at support;Live Load…
Q: 2. The initial state of stress at a point in the ground, in sandstone of Problem 1, is σ3 = 1300 psi…
A:
Q: rectangular channel 5.50 m wide and 1.30 m deep is laid on a uniform slope of 0.002. The roughness…
A: width of channel = 5.50 mdepth of channel = 1.30 mS = 0.002n = 0.013NOTE:Since you have posted…
Q: 20' B hinge C 8 R₁, Re M. and V 10' D 10' E Draw an influence line for reaction at A and determine…
A:
Q: For the beam and loading shown, determine the deflection at point C. Use E= 29 × 106 psi. It is…
A: A simply supported beam is loaded with an anti-clockwise moment M = 30.5 kip-ft, at 2.5ft from A.The…
Q: 6-3. Draw the influence lines for (a) the vertical reaction at B, (b) the moment at C, and (c) the…
A: beam is givensimply supported at Aroller support at BTo find:influence lines fora. vertical reaction…
Q: a) Determine the normal force at point D. Express your answer in kilopounds to three significant…
A:
Q: A levelling staff is held vertical at distance of 100 mm and 300 mm from the axis of a tacheometer…
A: levelling staff is held vertically at distance of 100mm and 300mm from the axis of a tacheometerThe…
Q: Problem 2: The beam is loaded as shown below. Determine the slope and deflection at a point located…
A: Given:Required:Deflection at 2m from left end
Q: A 75-mm-diameter galvanized iron pipe, having a roughness of ε = 0.2 mm, is used to carry water at a…
A: GIVEN DATA-Dia=75mm=0.2mmT=60V=3 =983.2 0.478()
Q: For a highway curve with R= 1000 m, I 16°30', and Pl station 3+264.759 m, calculate the requested…
A:
Q: Calculate the components of the resultant force at support A, measured in Newtons (N). Determine the…
A:
Q: Correct
A:
Q: A 3m B 10 kN 30 kN/m 1.0m 1.0m 25 kN/m C 1.0m 1.0m D
A: Given data,a continuous beamis given Fixed at AFINDusing moment distribution method group the value…
Q: A trapezoidal canal has a base width equal to the flow depth and a discharge of 0.83 m3/s. If…
A: A trapezoidal canal has a base width equal to the flow depth and a discharge of 0.83 m3/s. If…
Q: It is estimated that the BOD of raw sewage received at a treatment plant serving a population 20,000…
A:
Q: Please answer this question: * Under what conditions would you choose to use mat foundation instead…
A: We need to explain under what conditions would we choose to use mat foundation instead of footing…
Q: Determine the slopes and deflections at points B and D of the beam shown. Using PARTIAL DERIVATIVE…
A:
Q: Water with a total head of H- 12 mn flows freely from a reservoir into a concrete trapezoida channel…
A:
Q: 6.10 Refer to Figure P6.5a. The uniform surcharge is time dependent. Given q (kN/m²) = 2t (days)…
A: Given surcharge,
Q: Some waste has a five-day BOD at 20 °C equal to 210 mg/L and an ultimate OD of 350 mg/L. Find the…
A: Given data :BOD at 20oC is (L) = 210mg/LUltimate BOD at 20oC is (L) = 350mg/L
Q: Which of the following statements about task lighting is correct Select one: A. Ceiling lighting…
A: Task lighting is the specific provision of lighting in a construction site to enhance visibility and…
Q: (3) and (4) Determine the reactions at supports. Assume "E" is constant. Draw the moment diagrams…
A: Given:Required:Support reaction and moment diagramNote: As per bartleby guidelines only first…
Q: A chain line CDE crosses a river, D and E being on the near and distant banks respectively. A…
A:
Q: 5' - 0″ Sym. ---- 1' - 0″ tut 5" 1' - 0
A:
Q: Calculate and plot the stress distribution with depth at a point 6.0 m from the corner (along the…
A: Calculate and plot the stress distribution with depth at a point 6.0 m from the corner (along the…
Q: Determine the following: three moment equation coefficients for span A'-A-B. MA+ MB+ three moment…
A:
Q: Draw the isometric figure of the given multiview projection. HRP FRP I L III X-F====▬▬▬▬=====- F
A: Isometric view is a 3D representation of objects on a 2D plane where all three dimensions are…
Q: Q1:- discus the following sentence: - Most crops show significant signs of stress, such as wilting…
A: Wilting in crops is often a visible sign of stress, typically due to inadequate water availability,…
Q: A consolidation undrained (CU) triaxial compression test is conducted on a normally consolidated…
A: Asked: To determine the effective angle of friction () for the given CU test.Given:Consolidated…
Q: A rectangular channel (n = 0.012) 3.05 m wide and laid out with a slope of 0.0049 transports 13.6…
A:
Step by step
Solved in 3 steps
- Upon opening of the second envelope contractor ABC with the lowest calculated bid was determined. However the contractor ABC declined to push through with the contract. To whom should the contract now be awarded? Describe the process from the refusal of contractor ABC to the award of contract.A contractor provided a surety bond as required by the bid specification for the building project. In this situation, the contractor is referred to Producer Surety Oblige PrincipleIn the execution of any project, the contractor's role and responsibility is to: Oa. maintain safety and adhere to the schedule b. manage the construction site Oc. Both (a) and (b) odinitiate and finance the project A Click Submit to complete this assessment. wN x *. AR DELL
- 2. Who can declare a failure of bidding 3. Compressed work should not exceed 4. Outsiders who represent the publics interest in biddingT or F The Owner's level of risk, as well as their level of control, is highest on a Design-Bid-Build (Separate contracts) project. T or F Both Fixed Price and Cost Reimbursement contracts may be issued with Incentive clauses T or F Cost Reimbursement contracts are favored over Fixed Price contracts when the scope is indeterminate, the risk is high and/or availability of resources is uncertain T or F Design-Build is known as “Traditional" contracting T or F Privately financed contracts account for 70 – 80% of total construction volume.Distinguish thoroughly the two-envelope system involves in the submission of a technical proposal for bidding. lir
- 6. Match the following terms with the most correct explanation Term Explanation Payment Bond Provides the owner with an amount to cover the damages/costs if the apparent low withdraws Bid Bond Provides the owner with a means for completing the work if the contractor cannot complete it. Lien Protects suppliers, subcontractors and employees Non-payment by the General Contractor Performance Bond Used primarily in private contracting; the General contractor and first-tier subcontractors place a debt upon the facility if they haven't been paid.IDENTIFY1. Variation orders to the contract may be _________ wherein the revisedcontract amount after applying a variation to the scope of works will havean additional.2. Variation orders to the contract may be _________ wherein the revisedcontract amount after applying a variation to the scope of works will notchange it.3. These are the costs that are not physically seen while implementing theproject.Can the contractor, attempt to interpret the strict orders of specifications to prepare the bid?