  1. The Toyota truck plant in Indiana produces 150,000 trucks per year. The plant runs one eight�hour shift and makes 400 trucks per day. About 1300 people work on the final assembly line. Each truck has about 20 direct labor hours per car in it.

    1. Assuming the truck sells for $26,000 and workers earn $50 per hour in wages and benefits, what percentage of the cost of the truck is in direct labor?
    2. What is the production rate of the final assembly line?

Blurred answer
Students have asked these similar questions
A final assembly plant for a certain automobilemodel is to have a capacity of 240,000 units annually.The plant will operate 50 wk/yr, 2 shifts/day, 5 days/wk, and 8.0 hr/shift. It will be divided into three departments: (1) body shop, (2) paint shop, (3) trim-chassis-final department. The body shop welds the car bodies using robots, and the paint shop coats the bodies. Both of these departments are highly auto-mated. Trim-chassis-final has no automation. There are 15.5 hr of direct labor content on each car in this department, where cars are moved by a continuous conveyor. Determine (a) hourly production rate ofthe plant, (b) number of workers and workstations required in trim-chassis-final if no automated stations are used, the average manning level is 2.5, balancing efficiency 1⁄4 93%, proportion uptime 1⁄495%, and a repositioning time of 0.15 min is allowedfor each worker.
A toy manufacturing uses 51030 rubber wheels per year for its popular dump truck series. The firm makes its own wheels, which it can can produce at a rate of 800 per day. The toy trucks are assembled uniformly ( at a constant rate ) over the entire year. Carrying cost is $ 1.50 per wheel per year. setup cost for the production run of the wheel is $ 47. The firm operatyes 243 days per year. Determine each of the following: 1-Optimal run size 2-Use your final answer from part 1 to determine minimum total annual cost for carrying and setup 3-Cycle time for the optimal run size 4-Run time
A certain Batch manufacturing plant requires one operator to tend to 2 semiautomatic machines used in production. The plant operates one 10-hour shift per day for 250 days in a year. The operator is paid $30 per hour with applicable factory labor overhead rate of 50%. Other pertinent information about the system in include the information provided below. Determine the hourly cost of the system. Machine 1 Machine 2 Initial cost $125,000 $10,000 $5000 $150,000 $5000 $3000 Installation Yearly maintenance cost 10 years $5000 SL years $10,000 SV 20% 20% ROR 50% Applicable MOHR 30%

Chapter 1 Solutions

Degarmo's Materials And Processes In Manufacturing

Ch. 1 - Because no work is being done on a part when it is...Ch. 1 - What forming processes are used to make a paper...Ch. 1 - What is tooling in a manufacturing system?Ch. 1 - It is acknowledged that chipâ€�type machining is...Ch. 1 - Compare Figures 1.1 and 1.16. What are the...Ch. 1 - In a modern safety razor with three or four blades...Ch. 1 - List three purposes of packaging operations.Ch. 1 - Assembly is defined as the putting together of...Ch. 1 - What are the physical elements in a manufacturing...Ch. 1 - In the production system, who usually figures out...Ch. 1 - In Figure 1.8, what do the lines connecting the...Ch. 1 - Characterize the process of squeezing toothpaste...Ch. 1 - It has been said that low-cost products are more...Ch. 1 - Prob. 24RQCh. 1 - If the rolls for the cold-rolling mill that...Ch. 1 - Make a list of service systems, giving an example...Ch. 1 - What is the fundamental difference between a...Ch. 1 - Prob. 28RQCh. 1 - What kind of process is powder metallurgy: casting...Ch. 1 - In view of Figure 1.2, who really determines the...Ch. 1 - What costs make up manufacturing cost (sometimes...Ch. 1 - What are major phases of a product life cycle?Ch. 1 - How many different manufacturing systems might be...Ch. 1 - In general, as the annual volume for a product...Ch. 1 - The Toyota truck plant in Indiana produces 150,000...Ch. 1 - A company is considering making automobile bumpers...Ch. 1 - Many companies are critically examining the...Ch. 1 - We can analogize your university to a...Ch. 1 - What kind of manufacturing system (design) is your...Ch. 1 - What are the major process steps in the assembly...Ch. 1 - What is the relationship between Figures 1.2Â...Ch. 1 - Recently, National Geographic magazine asked the...
Knowledge Booster
Background pattern image
Mechanical Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Elements Of Electromagnetics
Mechanical Engineering
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Oxford University Press
Text book image
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:9780134319650
Author:Russell C. Hibbeler
Publisher:PEARSON
Text book image
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:9781259822674
Author:Yunus A. Cengel Dr., Michael A. Boles
Publisher:McGraw-Hill Education
Text book image
Control Systems Engineering
Mechanical Engineering
ISBN:9781118170519
Author:Norman S. Nise
Publisher:WILEY
Text book image
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:9781337093347
Author:Barry J. Goodno, James M. Gere
Publisher:Cengage Learning
Text book image
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:9781118807330
Author:James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:WILEY
How Shell and Tube Heat Exchangers Work (Engineering); Author: saVRee;https://www.youtube.com/watch?v=OyQ3SaU4KKU;License: Standard Youtube License